KOORDINASI RELE ARUS LEBIH DAN RELE GANGGUAN TANAH PADA GARDU INDUK AMPENAN

The Coordination Of Over Current Relay And Earth Fault Relay At The Ampenan Substation

Authors

  • Helni Septa Utani
  • Supriyatna .
  • Supriono .

Abstract

ABSTRAK

          Koordinasi sistem proteksi tenaga listrik bertujuan mengamankan gangguan pada sistem tenaga listrik untuk meminimumkan lamanya gangguan dan pelanggan yang terkena gangguan. Laporan bagian gangguan PT. PLN (Persero) APDP Mataram menunjukkan data gangguan yang terjaadi pada GI (Gardu Induk) Ampenan khususnya pada Penyulang Cemara dan Gunungsari tahun 2014 masing-masing mengalami gangguan 3005 menit per tahun dan 4219 menit per tahun. Gangguan tersebut merupakan gangguan hubung singkat yang menyebabkan OCR dan EFR bekerja.

          Penelitian ini menganalisis arus gangguan hubung singkat menggunakan software ETAP v7.5, dan koordinasi peralatan proteksi menggunakan software Power Plot 2.5 demo dan membandingkan TCC antara setting rele kondisi eksisting dan hasil perhitungan. Karateristik OCR dan EFR menggunakan standar invers. OCR standar inverse akan dikombinasikan dengan instantaneous.

          Hasil perhitungan TMS didapatkan untuk Penyulang Cemara dan Penyulang Gunungsari masing-masing 0,16 dan 0,15, sesuai arus gangguan penyulang. Sedangkan TMS kondisi eksisting untuk Penyulang Cemara dan Penyulang Gunungsari masing-masing 0,1 dan 0,05. Nilai setting OCR dan EFR yang direkomendasikan  pada Penyulang Cemara dan Gunungsari sudah baik karena dapat memberikan waktu bagi fuse bekerja lebih dahulu untuk mengamankan gangguan sehingga koordinasi proteksi yang tepat dapat tercapai.

Kata Kunci       : Koordinasi proteksi, OCR, EFR, Gangguan hubung singkat

ABSTRACT

The Coordination of electrical power protection system aimed at securing an appropriate The Coordination of electrical power protection system aimed at securing an appropriate disturbance in power systems with a view to minimizing the duration of disruption and minimizes the number of customers affected by disturbances. PT. PLN (Persero) APDP  Mataram fault section report shows fault occurrence data in Ampenan Substation, specifically for Feeder Cemara and Gunungsari in 2014, 3005 minutes per year and 4219 minutes per year respectively. These faults were short-circuit fault that caused OCR and EFR to operate.

This final project analyzing the flow of short circuit fault of aid ETAP software v 7.5, and coordinating protection devices using Power Plot 5.2 software demo that was done by comparing the TCC between existing conditions relay setting and calculation result. Characteristics of relay that is used in the Ampenan substation for OCR and EFR is standard inverse. OCR standart inverse will  combination with instantaneous.

While the result TMS is obtained for the Cemara feeder and Gunungsari feeder are 0,16 and 0,15  this condition are accordance with  the current major disruption to the feeder. Meanwhile, TMS existing condition for Feeder Cemara and Gunungsari are 0.1 and 0.05 respectively. Setting value of OCR and EFR recommended by Feeder Cemara and Gunungsari is good enough because of its capabilities to give a chance for fuse to operate earlier so that perform protection coordination precisely.   

Key words: Protection coordination, OCR, EFR, short-circuit fault

Published

2017-09-28

Issue

Section

Articles